Fujian Refining and Ethylene Project

The project is a world-scale integrated refining and chemical project, is one of the national key construction projects, which officially commenced construction in July 2005. All devices adopted the most advanced technology in the world, in order to achieve the maximum economic efficiency and the minimal environmental impact. By 2006 our firm has already achieved the contract package design for the project’s refinery tank farm, residual oil, waste oil, catalytic diesel and waste methanol tank farm, as well as the old factory’s docking support system with the project, hazardous chemicals and the database and factory design steam pipeline renovation project to the living area.